What DistroDesigner Developer answers
Enter the address, the project details, and you're done. The report provides insight into the electrical:
- Connection scope: the equipment required, and which party is responsible for each part of the work
- Requirements: additional equipment required, Vista switches, additional utilities that require engagement, and the design challenges the site presents
- Design: the connection schematic, and how existing overhead poles can be moved or modified
Built for BC developments over 500 kVA of CEC load, or that do not qualify for an express connection. This is not an engineering product.